8-2-2-7: TESTING:
When a drainage system is completed and ready for the connection of fixtures, it shall be tested by closing all openings and filling with water to the top. When the system will stand this test without showing any leaks, the building commissioner shall be notified, and he shall inspect the same, and if satisfactory, give the plumber a certificate of inspection. (Ord. 2023-12, 4-25-2023)