The following are required inspections:
(A) Water service lines per city code;
(B) Sewer lines per city code;
(C) 5# - 15 minute pressure test of all underground drain lines inside a building before the floor is poured;
(D) 5# - 15 minute pressure test of all drain and vent lines inside a building before the wall materials are installed;
(E) Water lines for proper size and proven water tight;
(F) Final manometer test of all plumbing fixtures after fixtures are set and their traps filled with water;
(G) Final plumbing inspection.
(Ord. 395, passed 4-28-03)