§ 118.13 EQUIPMENT, STRUCTURE OR CABINET SETBACK.
   (A)   All structures or cabinets shall conform to the setback requirements of the underlying zoning district.
   (B)   Under a conditional use permit the Planning Commission must determine such technical matters as setbacks as a part of the conditional use application, the structure or cabinet setback and buffering. The Planning Commission must consider the lot size, surrounding land uses, site characteristics such as topography and existing vegetation, and proximity of dwellings to the proposed accessory structures. The Planning Commission must determine the most appropriate method for buffering structures or cabinets in the conditional use application process.
   (C)   Where fences are used to control unauthorized climbing of towers, the site plan shall conform to the requirements of the underlying zoning district. Fences or walls shall be located between the bufferyards and tower in the conditional use application process.
(Ord. 386, passed 8-12-02) Penalty, see § 10.99