Prior to the issuance of a demolition permit, the applicant shall be required to:
(A) Shut off, discontinue, and disconnect all utilities including cable television, internet, telephone, electric, gas, water, and sewage services;
(B) Water should be shut off at the buffalo box, copper should be bent upward, and sewer should be capped off with a fernco cap or similar cap, and located with a 2x6, or size necessary to mark location of cap; and
(C) Obtain testing of roof materials, floor materials, insulation, and wall board to determine the presence of friable and non-friable asbestos by a licensed testing firm, and to submit the test report and a written plan for removal of such asbestos materials from the site in a manner required by law.
(Ord. 2019-6, passed 5-20-19)