No persons shall occupy any structure prior to receiving the proper occupancy permits. All occupancy permits are subject to all federal, state and local regulations (for example, Building Codes), including, but not limited to the following: final lot grading in accordance with the subdivision engineering design elevations; proper gutter, downspout and drainage design; hard surface coat on driveway; completion of sidewalks and entrance walkways, if applicable; stairways and appropriate railings to all outside entrances and posting of address with three inch contrasting numerals and the like.
(Ord. 1995-2, passed 1-3-95)