(A) See “Specifications and Standards for Acceptance of Municipal Improvements.”
(B) All lot elevations as stated in the plans shall be maintained by the subdivider, builder and any subsequent owners of the lot. No elevation shall be altered unless approved by the Town Engineer.
(C) Rear yard drains shall be provided to prevent ponding in the rear yard areas and shall be connected to an enclosed storm drainage system.
(D) The subdivider shall be required to clean and maintain any mutual drains which are utilized for the storm drainage of the subdivision, as required by the town, in accordance with the standards and requirements of the town, prior to the acceptance of the storm drainage system.
(E) The subdivider shall clean the storm drainage system and maintain the same in accordance with the standards and requirements of the town, prior to the acceptance of the storm drainage system by the town.
(F) If there are any open watercourses, they shall have adequate capacity and erosion control to insure safe and healthful disposal of storm water.
(G) When top soil has been removed from the surface of a lot on a slope where erosion will cause a displacement of loose materials, the subdivider shall be required to seed or provide other means to prevent the wash from damaging adjacent property or accumulation on street surfaces.
(Ord. 1995-2, passed 1-3-95)
Cross reference:
Specifications and standards for acceptance of municipal improvements, see Chapter 95