§ 155.459 DECOMMISSIONING.
   (A)   The applicant of a wind energy system shall notify the township upon the removing of a wind energy system. All electrical connections between the system and the electrical system of the home, farm or business shall be inspected by the township to ensure the connection to the utility company system has been properly removed.
   (B)   The applicant shall be responsible for notifying the utility company of the removal of the system.
(Ord. 11-001, passed 1-18-2011)