In cases where less than the full required future right-of-way width of a street has been deeded or dedicated, the building setback on any properties abutting thereon which have not provided for sufficient street area by deed or dedication shall be measured from the future required right-of-way line. The required setback shall be determined by the Township Planning Commission.
(Ord. 06-14-Z, passed 10-3-2006; Ord. 06-14, passed 10-17-2006)