§ 155.004 PUBLIC SANITARY SEWER CONNECTION.
   When a public sewer is available or becomes available in the street, connection to the public sewer system shall be made within 180 days.
(Ord. 06-14-Z, passed 10-3-2006; Ord. 06-14, passed 10-17-2006)