Upon completion of the final grading and seeding of the site, the permit holder shall file with the City Engineer a final plot plan, which shall show the final grades of the improvement as constructed. Such plan shall be certified, by a registered civil engineer or surveyor, as to the accuracy of the plan in depicting the actual construction. Such civil engineer or surveyor shall also certify that he or she has made an actual field observation of as-built conditions and that such conditions are as shown on the plan. The form of such certification shall be prescribed by the City Engineer.
(Ord. 89-O-36, passed 9-5-1989)