§ 52.032 SEWER TAP CONSTRUCTION.
   (A)   All costs and expenses incidental to the installation and connection of the building sewer shall be borne by the owner(s). The owner(s) shall indemnify the city from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer.
   (B)   A separate and independent building sewer shall be provided for every building; except where one building stands at the rear of another or an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, court, yard or driveway. The building sewer may be extended to the rear building and the whole considered as one building sewer, but the city does not and will not assume any obligation or responsibility for damage caused by or resulting from any such single connection aforementioned.
   (C)   Old building sewers may be used in connection with new buildings only when they are found, on examination and test by the Sewer Department Supervisor, to meet all requirements of this subchapter.
   (D)   (1)   The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench, shall all conform to the requirements of the Building and Plumbing Code or other applicable rules and regulations of the city. In the absence of code provisions or in amplification thereof, the material and procedures set forth in appropriate specifications of the ASTM and WPCF Manual of Practice No. 9 shall apply.
      (2)   Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be lifted by an approved means and discharged to the building sewer.
   (E)   No person(s) shall make connection of roof downspouts, foundation drains, areaway drains or other sources of surface runoff or groundwater to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer unless such connection is approved by the Sanitary Sewer Supervisor for purposes of disposal of polluted surface drainage.
   (F)   The connection of the building sewer into the public sewer shall conform to the requirements of the Building and Plumbing Code or other applicable rules and regulations of the city for the procedures set forth in appropriate specifications of the ASTM and the SPCF Manual of Practice No. 9. All such connections shall be made gas-tight and water-tight and verified by proper testing. Any deviation from the prescribed procedures and materials must be approved by the Sewer Board Supervisor before installation.
   (G)   The applicant for the building sewer permit shall notify the Sewer Department Supervisor when the building sewer is ready for inspection and connection to the public sewer. The connection and testing shall be made at the point of connection under the supervision of the Sewer Department Supervisor or his or her representative.
   (H)   All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the city.
(Ord. 25, passed 3-13-2018) Penalty, see § 52.999