§ 94.17 BASE AND BITUMINOUS MIX.
   (A)   The base of said roadway shall consist of two-inch stone (in size) and three-inch stone (in size) compacted to a minimum of six inches in depth. Following the compacting of the two-inch and three-inch stone, there shall be a layer of one-half-inch stone (in size) crusher run to a depth of one inch to fill all voids in said roadway.
   (B)   The hot laid asphaltic base shall be of a minimum of two and one-half inches compacted over the base described in division (A) above.
   (C)   A hot laid asphaltic wearing course placed on top of the hot laid asphaltic base shall be a minimum of one and one-half inches compacted.
   (D)   All compaction of items hereinbefore referred to be compacted shall be done with a minimum of a ten-ton tandem roller.
(Ord. 31, passed 5-24-1994)