Upon the completion of any work in any street or right-of-way, the person(s) performing such work shall file with the village detailed, as-built drawings showing what was installed in what location, what materials were used in restoration and such other information as may be required by the Village Manager.
(Ord. 02 10-09, passed 10-12-2009)