(A) Preliminary plan submission.
(1) Each applicant for PUD rezoning must submit to the Zoning Administrator 8 copies of a preliminary development plan.
(2) The Zoning Administrator, after review, shall forward the preliminary plan to the Planning Commission or return it to the applicant for additional information.
(B) Preliminary plan content. Each PUD preliminary plan shall include the following, unless waived by the Zoning Administrator as not applicable:
(1) A written legal description of all the lands proposed within the PUD;
(2) A small-scale sketch of all properties, streets, and uses within ½ mile of the PUD boundaries;
(3) A plan containing the same information as required for a proposed site plan by § 152.228 and the other information as is required by the Zoning Administrator; and
(4) A narrative describing the following:
(a) The overall objectives of the PUD;
(b) Source and method of financing;
(c) Number of acres allocated to each use;
(d) Gross residential densities where applicable;
(e) Proposals for providing sewage disposal, potable water, and other public and private utilities;
(f) Proposed method for providing storm drainage; and
(g) Preliminary architectural sketches and/or a statement as to the type of construction and materials which will be used throughout the planned unit development.
(Ord. passed 10-23-1978, § 13.07)