A. Rate Structure: The permit rate structure and fees as set forth herein shall be the rate structure of the collection of permits dealing with the construction, remodeling, plumbing, electrical, mechanical, roofing, and gas fees and charges.
B. Inspection; Notice: The holder of a permit shall notify the inspector's office when the installation is ready for under floor, rough-in, and final inspections. It shall be unlawful for equipment to be covered or concealed by building material until proper inspection is made. The inspector shall cause such inspections to be made within forty eight (48) hours of the time of receipt of such notice, exclusive of Saturdays, Sundays, and holidays recognized by the city. (Ord. 941, 11-14-2011)