(A) An application for a TS special use permit shall be submitted to the Board of Commissioners by filing a copy of the application in accordance with § 153.362.
(B) The Board of Commissioners shall not approve a TS special use permit unless it first conducts a public hearing in the manner provided in §153.362 and shall only authorize issuance of the permit if it concludes, based upon the information submitted at the hearing, that if completed as proposed, the overhead transmission system:
(1) Will not materially endanger the public health, safety, or welfare;
(2) Will not injure the value of property in the vicinity of the proposed overhead transmission system;
(3) Will be in harmony with the area in which it is to be located;
(4) Will be in general conformity with the comprehensive plan; and
(5) Will not result in the existence of more than one overhead transmission system through the town for a period of greater than one year.
(Ord. 06-20, passed 8-14-06; Am. Ord. 18-4, passed 6-14-21)