2-7-4: ADMINISTRATION; STANDARDS FOR REVIEW:
Upon receipt of an application for a building permit, and upon receipt of plans, drawings, specifications, architectural renderings or other similar documentation regarding a proposed building(s) by which the same can be reasonably evaluated, whichever first occurs, the building commissioner shall file with the committee a copy of the application and all documentation submitted therewith, which should include a site and layout plan and specifications. Sufficient copies of all such documentation shall be required to be submitted by the applicant in order to comply with this provision. The architecture committee shall review any such application within thirty (30) days from the date of referral. In reviewing said applications as submitted, the committee shall give consideration to the following:
   A.   The architectural value and significance of the structure or its site.
   B.   The relationship of the exterior architectural features of the proposed structure to the existing structures and to the surrounding area.
   C.   The compatibility and continuity of exterior design, arrangement, texture and material to be used with that used in the surrounding area.
   D.   Compatibility in relation to other property in the surrounding area, and orientation of building to site.
   E.   The building code provisions of title 4, chapter 9 of this code.
   F.   The architectural review criteria 1 . (Ord. 97-O-737, 1-4-1997)

 

Notes

1
1. Available for inspection in the village administrator's office.