1272.04 TRAILER PARKS; SUBMISSION OF PLANS.
   An application for the establishment of a trailer park shall be filed with the Zoning Inspector and must be accompanied by a scale drawing certified by a registered engineer or surveyor. Such drawing shall contain the following information:
   (a)   Accurate dimensions of the proposed trailer park;
   (b)   All roads and approaches and the method of ingress and egress;
   (c)   The complete electric service installation, wire service outlets and lighting facilities;
   (d)   The complete location of any natural gas facilities to serve the trailer park;
   (e)   A complete layout of unit parking spaces and the number of square feet therein, together with the dimensions thereof; and
   (f)   The location of electric power or gas distribution systems; water mains or wells for water supply outlets for domestic water users; location of sanitary facilities, washrooms, garbage disposal units, incinerators, sanitary sewers, septic tanks, sewer drain lines, leeching beds and other buildings or structures contemplated to be used by such applicant in connection with such business.
(Ord. 1420. Passed 2-28-66.)