The subdivider shall prepare and submit the following:
(a) Six copies of the final plat of the proposed subdivision.
(b) Three copies of construction drawings related to the improvements to be constructed in the proposed subdivision.
(c) Two copies of an itemized engineer's estimate with quantities for all proposed improvements, including the estimate of cost for each item.
(d) A copy of the storm sewer and storm detention calculations and other applicable calculations for design.
(e) A completed final plat checklist with remarks.
(f) A completed final construction plan checklist with remarks (see Design Criteria for list.)
All final plats, construction drawings and supporting documents shall meet all Design Criteria and Construction Standards and Drawings established by the City of Kenton, the Zoning Code of the City of Kenton, or requirements established by other governmental organizations having jurisdiction over the improvements. The most restrictive requirements shall apply.
The final plat shall be considered officially filed on the day it is received and properly noted and shall be so dated. However, the final plat shall not be considered properly submitted until all applicable fees are paid by the developer (see Schedule of Fees - Section 1222.04) and until all plans, supporting documents and materials are provided to the Safety-Service Director.
(Ord. 97-022. Passed 1-12-98.)