(a) The Director may modify an WDP for good cause, including, but not limited to, the following reasons:
(1) To incorporate any new or revised Federal, State, or local Pretreatment Standards or requirements;
(2) To address significant alterations or additions to the User’s operation, processes, or Wastewater volume or characteristics since the time of the WDP issuance;
(3) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized Discharge;
(4) Information indicating that the permitted Discharge poses a threat to the City’s POTW, City personnel, the receiving waters, or Bio-solids reuse options;
(5) Violation of any terms or conditions of the WDP;
(6) Misrepresentations or failure to fully disclose all relevant facts in the WDP application or in any required reporting;
(7) Revision of or a grant of variance from Categorical Pretreatment Standards pursuant to 40 CFR 403.13;
(8) To correct typographical or other errors in the WDP; or
(9) To reflect a transfer of the facility ownership or operation to a new owner or operator where requested in accordance with Section 915.30