The Director shall evaluate whether a SIU needs an accidental Discharge/Slug Discharge control plan or other action to control Slug Discharges. The Director shall evaluate the need for a plan, device or structure to control a potential slug discharge at least once during the term of each significant industrial user's control mechanism. Additional significant industrial users shall be evaluated within one year of being identified a significant industrial user. The Director may require any User to develop, submit for approval, and implement such a plan or take such other action that may be necessary to control Slug Discharges. Alternatively, the Director may develop such a plan for any User. An accidental Discharge/Slug Discharge control plan shall address, at a minimum, the following:
(a) Description of Discharge practices, including non-routine batch Discharges;
(b) Description of stored chemicals that have the potential of entering the POTW;
(c) Procedures for immediately notifying the Director of any accidental or Slug Discharge, as required by Section 915.39
of this Ordinance; and
(d) Procedures to prevent adverse impact from any accidental or Slug Discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic Pollutants, including solvents, and/or measures and equipment for emergency response purposes.
(Ord. 2015-81. Passed 4-15-15.)