913.03 PERMITS TO BE SECURED BEFORE WORK BEGUN; INSPECTION FEE REQUIRED.
    (a)   A waterline installation or repair permit shall be obtained from the Deputy Service Director/Superintendent of Engineering and all other necessary permits, including excavation and plumbing permits, shall be obtained and application there for shall be made at least twenty four hours prior to the time the work is intended to begin. The fee for the necessary permit shall be that set forth in the Building Code, as amended, and shall be in addition to any applicable tap in fee.
   (b)   There shall be a charge of twenty five dollars ($25.00) for the initial inspection. There shall be an inspection fee of fifteen dollars ($15.00) for any subsequent inspection. Failure of the owner of the premises to pay the subsequent inspection fee within fifteen days after being notified that such fee is due shall result in the inclusion of such inspection fee on the next water bill, for collection. (Ord. 1986-4. Passed 1-22-86.)