1173.12  FENCING AROUND WELL HEAD.
   All well heads shall be enclosed by a six (6) foot cyclone fence with barbed wire along the top and shall be erected within six (6) weeks after fracturing or within six (6) months after the commencement of drilling, whichever occurs first.