(A) Where required. These standards shall apply within all districts.
(B) Location. Temporary construction trailers may not be placed within a street right-of-way.
(C) Setback. Temporary construction trailers must be placed at least 20 feet from adjoining property lines.
(D) Time limit. Temporary construction trailers may only be placed on a property for which a valid building permit has been issued. Trailers may remain only during the period of actual construction. They must be removed from the premises prior to a certificate of occupancy being issued for the structure.
(Ord. passed 3-5-2018) Penalty, see § 152.999