§ 53.001 LEADERS AND CONNECTION WITH STORM SEWER REQUIRED; PROCEDURE IN CASE OF NONCOMPLIANCE.
   (A)   Every building without a yard adequate to absorb the surface water collected from the building shall be equipped with proper metallic leaders for conducting water from its roof in a manner as shall protect the walls and foundation from damage and shall be connected with a public storm sewer whenever there is a sewer available in any abutting street or alley. The leaders shall be so placed and the connection shall be so made that no water flows upon any public sidewalk or damages any street or alley abutting the building.
(Prior Code, § 23-1)
   (B)   Whenever a building does not comply with one or more of the requirements of division (A) above, the City Administrator shall serve a notice on the owner of the building requiring him or her to install the necessary roof drainage facilities and to make connection with a storm sewer as required by division (A) above. It shall be unlawful for any owner to fail to comply with the requirements of division (A) above within 30 days of the service upon him or her of notice to do so.
(Prior Code, § 23-2)
(Ord. 430, passed - -) Penalty, see § 53.999