§ 152.255 APPLICATION.
   (A)   All mobile homes shall be installed on an approved permanent foundation, and if necessary shall be skirted with material matching the design and color of the respective manufactured or mobile home within 60 days of installation. All skirting shall be kept in place and in good repair at all times.
   (B)   An overall plan for development of a mobile home park shall be submitted to the town’s Planning Commission for review. The plan shall be drawn to a scale no smaller than one connection.
(Ord. 03-09-2000, passed 3-3-2000)