§ 156.037 C, COMMERCIAL ZONE.
   (A)   Uses permitted outright. In a C Zone, the following uses are permitted outright:
      (1)   Retail or wholesale establishment;
      (2)   Eating or drinking establishment;
      (3)   Financial institution;
      (4)   Office;
      (5)   Sign;
      (6)   Hotel, motel;
      (7)   Government use;
      (8)   Community building, community center not including schools or churches;
      (9)   Repair and maintenance shops;
      (10)   Amusement establishment;
      (11)   Second hand store;
      (12)   Second floor residential; and
      (13)   Permitted transportation uses and activities, as defined in § 156.003 of this chapter.
   (B)   Conditional uses. In a C Zone, the following uses and their accessory uses are permitted when authorized in accordance with §§ 156.110 through 156.115 of this chapter:
      (1)   Residential (single- and multiple-family);
      (2)   Mini-storage buildings;
      (3)   Light industrial business; and
      (4)   Construction, reconstruction or widening of highways, roads, bridges or other transportation projects which are:
         (a)   Designated in the Transportation System Plan (including the Bicycle and Pedestrian Plan) but for which no site-specific decisions have been made; or
         (b)   Not otherwise approved as the result of a land division, site development review or conditional use application.
   (C)   Dimensional standards. In a C Zone, all new structures and any alterations, repairs or extensions of an existing structure shall conform to the following standards.
      (1)   All roofing must be non-reflective.
      (2)   Height shall not exceed 30 feet as measured from the average elevation of the finished ground level at the center of all walls of a building to the highest point of the structure. This height of 30 feet is restricted to that portion of Highways 82/351 and the alley bordering the lot east or west of the property line. In all other Commercial Zones, the height is restricted to 25 feet as measured from the average elevation of the finished ground level at the center of all walls of a building to the highest point of the structure.
      (3)   There shall be no yard setbacks in a C Zone.
(Ord. 2009-01, passed - -2009)