The subdivider shall be responsible for providing water lines and fire hydrants to each lot or parcel and connecting the subdivision to the city mains, as required by the Council. Adequate water pressure, as determined by the state’s Board of Health, will be provided to each lot by the developer.
(Ord. 2009-01, passed - -2009)