§ 154.510 PERMITS REQUIRED.
   A permit must be obtained from the Zoning Administrator to verify if a development meets all applicable standards outlined in this subchapter prior to conducting the following activities:
   (A)   The erection, addition, modification, rehabilitation, or alteration of any building, structure, or portion thereof. Normal maintenance and repair also requires a permit if such work, separately or in conjunction with other planned work, constitutes a substantial improvement as in § 154.020 of this chapter.
   (B)   The construction of a dam, on-site septic system, or any fence not meeting the definition of a farm fence outlined in § 154.020 of this chapter.
   (C)   The change or extension of a nonconforming use.
   (D)   The repair of a structure that has been damaged by flood, fire, tornado, or any other source.
   (E)   The placement of fill, excavation of materials, or the storage of materials or equipment within the floodplain.
   (F)   Relocation or alteration of a watercourse (including stabilization projects or the construction of new or replacement culverts and bridges), unless a public waters work permit has been obtained from the Department of Natural Resources.
   (G)   Any other type of "development" as defined in this chapter.
(Ord. 2020-09, passed 1-4-2021)