(1) The plat approval for subdivisions is begun in the office of the Code Administrator. A preliminary application is issued to the person wishing to subdivide, who must follow the guidelines on A-1 (both requirements and necessary reviews).
(2) Once the preliminary application is completed, the Code Administrator places it on the next Subdivision and Land Use Committee agenda, publishes the notice and sends a letter to all contiguous owners.
(3) The Subdivision and Land Use Committee sends their approval or disapproval within 60 days to the County Board.
(4) With approval from the Board, the plat may be finalized by having all necessary signatures, notice of school district involved and any other needed documentation. This is then again brought to the Subdivision and Land Use Committee; they send their approval within 90 days to the County Board. Upon approval by the Board, the plat can be recorded.
(5) If any change is necessary for the plat, the process begins again.
A-1 | ||||
Preliminary Plat Application | ||||
Subdivision Name _____________________________ | Case No. ___________ | |||
Requirement | Section | Yes | No | N/A |
A-1 | ||||
Preliminary Plat Application | ||||
Subdivision Name _____________________________ | Case No. ___________ | |||
Requirement | Section | Yes | No | N/A |
Two copies of written request for preliminary review | 156.037(B)(1) | |||
Eight prints of preliminary plat and required documents | 156.037(B)(2) | |||
Payment of review fee, copy or receipt | 156.064(B) | |||
Name of proposed subdivision | 156.049(A) | |||
Key map showing relation of subdivision to other developments | 156.049(B) | |||
Name of owner, developer and registered surveyor/engineer | 156.049(C) | |||
Existing and proposed streets, rights-of-way and other data | 156.049(D) | |||
Tract boundary lines, showing lengths, directions and references | 156.049(E) | |||
All lot lines adjacent to and abutting subdivision with identifications | 156.049(F) | |||
Layout of proposed lots with dimensions, areas, and identifications | 156.049(G) | |||
Parcels to be dedicated to public use(s) and its use(s) | 156.049(H) | |||
Location and size of all existing public utilities and drainage within or adjacent to proposed subdivision | 156.049(I) | |||
Location and size of all proposed utilities to be installed | 156.049(J) | |||
Easements, existing and proposed, locations, widths and use | 156.049(K) | |||
Gross and net area of subdivision, street rights-of-way and other parcels reserved for common use | 156.049(L) | |||
Topography map with contour lines as required | 156.049(M) | |||
Locations of watercourses, ponding areas, drainage and flood area | 156.049(N) | |||
Drawn to scale 50 ft. to 1 in. or 100 ft. to 1 in. | 156.049(O) | |||
North arrow and date of plat | 156.049(P) | |||
Entire development submitted for approval (no stage approvals) | 156.049(Q) | |||
“PLAT NOT FOR RECORD” printed upon plat | 156.049(R) | |||
Locations of existing structures and other features | 156.049(S) | |||
Landscaping plan, proposed signage for advertising | 156.049(T) | |||
Soil information and map (when required) | 156.049(U) | |||
Soil investigation test and locations (when required) | 156.049(V) | |||
Reviews | ||||
County Engineer review | ||||
IDOT review (when required) | ||||
Township Road District review | ||||
Soil and Water Conservation District review | ||||
911 Coordinator review | ||||
Submittal to municipality if within 1.5 miles of limits | ||||
Subdivision and Land Use Committee action | ||||
County Health Department review | ||||
(Ord. passed 10-14-2003; Ord. passed 11-10-2003; Ord. passed 11-14-2004; Ord. passed 9-11-2007)