§ 153.108 FINAL CERTIFICATION.
   Prior to final approval by the county, a registered professional engineer shall certify that detention basin has been constructed in accordance with construction plans and proposed volume has been provided. An “as-built” survey of the detention basin, prepared by a license surveyor, shall be included with the certification for approval.
(Ord. passed 9-8-2009)