(A) G1. Top soil removal for commercial purposes.
(1) Temporary borrow sites incidental to construction.
(2) No processing of materials or stockpiling of recyclable bituminous or demolition materials.
(3) Extraction and reclamation to occur in same construction season.
(4) Peat and humus extraction.
(B) G2. All G1 uses.
(1) Natural material removal only, no processing, with exception for screening equipment.
(2) Site may be used for many years and developed in phases.
(3) Site may be used for stockpiling of screened materials.
(C) G3. All G1 and G2 uses.
(1) Site may include crushing, screening, washing, and processing of bituminous and demolition materials.
(2) Stockpiling of recyclable demolition and bituminous can occur.
(D) G4. All G1, G2, and G3 uses. Site may include hot mix operations and bituminous reprocessing.
(E) G5. All G1, G2, G3, and G4 uses. Site may include redi-mix concrete plant.
(Ord. passed 4-10-2017)