(A) All land-disturbing activities shall be in conformance with the Town of James Island Stormwater Management and Sediment Control Ordinance and all state and/or federal regulations that may be applicable.
(B) The design professional shall prepare appropriate sediment and erosion control designs and show sufficient data, including material lists, details, and time schedules, to ensure best management practices are followed. The developer shall be responsible for ensuring that the design professional's designs are constructed in a timely manner and properly maintained throughout the duration of the development's construction period. If sediment is carried downstream as a result of inadequate design, improper construction, or maintenance neglect, the developer shall ensure that the eroded soil is removed from the downstream properties and legally disposed.