(a) Water line construction including materials of construction, pipe bedding, leak testing, etc., shall be approved by the Director of Water/Wastewater.
(b) In no case shall water mains be less than six inches outside pipe diameter.
(c) The developer shall provide and install as directed as many fire hydrants as determined by the Director of Water/Wastewater.
(d) The developer shall provide water service lines for each lot at the time of construction of the main and shall cause the taps to be made by using service clamps, corporation stops, curb boxes, compression stops, copper setters, meters tips and meters. Such taps shall be made under the direction and approval and approved by the Director of Water/Wastewater .
(e) The City shall provide all water meters, meter pits and copper setters when each lot is developed. The City shall maintain ownership of the same.
(f) The owner or developer of each lot shall pay the water tap fee at the time the lot is developed.
(Ord. 76-91. Passed 11-11-91.)