1311.01 PERMIT REQUIRED.
   (a)    No person shall construct, alter, extend, remove or demolish or commence construction, alteration, extension, removal or demolition of a building or structure or install equipment for the operation of a building or structure without first filing with the building official an application in writing and obtaining a formal permit. A permit for demolition shall expire within a period of sixty days from the date such permit was granted except that such permit shall be extended for a period of three months upon the application of the permit holder prior to the expiration of the aforementioned sixty day period to the Board of Appeals as defined in Chapter 1309.
(Ord. 07-05. Passed 2-28-05.)
   (b)    No permit shall be required for the commencement of minor repairs, remodeling and general maintenance of a residence, commercial or industrial building as long as the cost of repairs, remodeling and general maintenance does not exceed the sum of two thousand dollars ($2,000) and also as long as the repairs, remodeling and general maintenance does not include the installation of a new bathroom or toilet facilities within such building.
(Ord. 51-65. Passed 5-24-65.)
   (c)   No permit shall be required for seasonal temporary swimming pool structures. A seasonal temporary swimming pool structure is a structure which is removed at the end of each swimming season.
   Seasonal temporary swimming pool structures shall be required to have fencing in accordance and in compliance with the fencing requirements set forth in Chapter 1327.
(Ord. 116-04. Passed 7-12-04.)