925.20 SETTLEMENT OF SURFACE OVER A DRAIN; NOTIFICATION, REPAIR EXPENSE .
   Any settlement of the surface over a drain on any street or public way occurring within six months after the laying of the drain shall be repaired by the Service-Safety Director at the expense of the drain-layer, if the repairs are not made by the drain-layer within twenty-four hours after notice to repair is given to the drain-layer by the Director.
(Ord. 500. Passed 3-24-52.)