§ 56.038 HAULED WASTEWATER.
   (A)   Septic tank waste may be introduced into the POTW only at locations designated by the Operational Manager, and at such times as are established by the Operational Manager. Such waste shall not violate §§ 56.015 through 56.020 or any other requirements established by the city. The Operational Manager may require septic tank waste haulers to obtain individual wastewater discharge permits.
   (B)   The Operational Manager may require haulers of industrial waste to obtain individual wastewater discharge permits. The Operational Manager may require generators of hauled industrial waste to obtain individual wastewater discharge permits. The Operational Manager also may prohibit the disposal of hauled industrial waste. The discharge of hauled industrial waste is subject to all other requirements of this chapter.
   (C)   Industrial waste haulers may discharge loads only at locations designated by the Operational Manager. No load may be discharged without prior consent of the Operational Manager. The Operational Manager may collect samples of each hauled load to ensure compliance with applicable standards. The Operational Manager may require the industrial waste hauler to provide a waste analysis of any load prior to discharge.
   (D)   Industrial waste haulers must provide a waste-tracking form for every load. This form shall
include, at a minimum, the name and address of the industrial waste hauler, permit number, truck identification, names and addresses of sources of waste, and volume and characteristics of waste. The form shall identify the type of industry and known or suspected waste constituents.
   (E)   Waste haulers shall not dispose of RCRA hazardous wastes.
(Prior Code, § 56.028) (Ord. 2011-52-02, passed 1-12-2015; Ord. 2014-01, passed 1-12-2015)