§ 51.083 EASEMENT REQUIREMENTS.
    All stormwater quality management systems, including detention or retention basins, filter strips, pocket wetlands, in-line filters, infiltration systems, conveyance systems, structures and appurtenances located outside of the right-of-way shall be incorporated into permanent easements. For developments occurring outside the town's limits and/or at the discretion of the Ingalls Town Engineer and/or the Ingalls Drainage Board, the developer shall petition to establish the noted system as a portion of regulated drain pursuant to the provisions of I.C. 36-9-27-54, and the drainage plan shall not be accepted until such petition is submitted in a form accepted by the Ingalls Town Engineer and the Ingalls Drainage Board. For the purposes of monitoring, inspection, and general maintenance activities, the petition should include a 30-foot wide perimeter beyond the actual footprint of the stormwater quality management facility.
(Ord. - -, passed 12-20-21)