(A) Installation of approved water infrastructure. For any development, subdivision or lot split of an applicant’s property approved by the city, such applicant shall construct, at his or her own expense and cost, a potable water system, which shall consist of water mains, laterals, meters, fire hydrants, valves, pumps, and storage facilities, the standards, design
and construction of which shall be as approved by the city. After such applicant's potable water system has been completed and attached to the water system and accepted by the city, the ownership of such potable water system shall be dedicated to the city and become a part of the water system.
(B) Use of service connections when property is subdivided. When property provided with a service connection is split or subdivided, the service connection shall be considered as belonging to that part of the lot or parcel of land which it directly enters.
(Ord. 1291, passed 2-7-01)