§ 54.090 RELOCATION OF CONNECTION.
   Any person desiring to change the location of a water service that has already been installed shall make application to the Water Department and, upon payment in advance of the cost of time and material, including excavation and repaving, as estimated by the Water Superintendent, the Water Department will cause the change to be made.
('61 Code, § 24.37) (Ord. 257, passed - - )