Skip to code content (skip section selection)
Compare to:
170.22 WATER.
The subdivider shall at the subdivider’s expense provide the subdivision with a complete water main supply system including hydrants, valves and other appurtenances which shall be extended into and through the subdivision to the boundary lines, and which shall provide a water connection for each lot, and shall be connected to the City water system. Fire hydrants shall be uniform throughout the subdivision and shall meet the standards and design approved by the Utilities Board of Trustees. Where water mains in excess of eight inches are required, the additional cost shall be borne by the City if the area is zoned R-2 or R-3. If at the time the main is to be installed the area in question is zoned R-4, any commercial or any industrial classification, the subdivider may be required to put in a water main in excess of eight inches at the subdivider’s own expense. Whether the City shall pay a portion of the additional cost shall be discretionary with the Board of Trustees. Water mains shall extend to the boundaries of the subdivision so as to provide for extension by adjoining properties.