Before the record plat is approved or, alternatively, before the performance bond is released, the subdivider shall obtain installation of all utility services required hereunder.
(A) Water supply. All new subdivisions shall include public water mains that meet the minimum standards of the Louisville Water Company and § 150.069 of the county’s Code of Ordinances (Fire Hydrants). These standards may include, but are not limited to, size of water mains, flow capacity of mains, fire hydrant locations, primary feed for a new development, and the like. Prior to being placed in service, the water mains must be accepted by the Louisville Water Company.
(B) Fire hydrants. Fire hydrants shall be provided as required by § 150.069 of the Metro Louisville Code of Ordinances (or successor regulation). All fire hydrants and water lines shall be in accordance with the standards of the Louisville Water Company.
(C) Power supply. All subdivisions hereafter proposed shall be provided with an adequate power supply system.
(LDC § 7.4.20) Penalty, see § 155.999