There is hereby established the following schedule of fees for zoning permits, appeals, zoning applications, and other matters pertaining to the city zoning regulations:
Residential Building Permit Fees | ||
Construction Type | Fee | Notes |
Residential Building Permit Fees | ||
Construction Type | Fee | Notes |
Single Family Dwelling (Detached) | $0.22 per square foot | a separate HVAC permit is required for all installations |
Two Family Dwelling | $0.22 per square foot | a separate HVAC permit is required for all installations |
Condominium/Townhome | $0.22 per square foot | a separate HVAC permit is required for all installations |
Alteration/remodel | $0.22 per square foot | a separate HVAC permit is required for all installations |
Modular Home | $240 | a separate HVAC permit is required for all installations |
Manufactured Home | $120 | a separate HVAC permit is required for all installations |
Move and Set | $240 | a separate HVAC permit is required for all installations |
Large addition | $240 | a separate HVAC permit is required for all installations |
Small addition | $150 | a separate HVAC permit is required for all installations |
Sun Room | $90 | |
Large Accessory Storage Structure | $150 | |
Small Accessory Storage Structure | $90 | |
Accessory Structures/Uses | $90 | (decks, porches, walls +) |
Basement finish/remodel | $120 | |
In ground pool | $90 | |
Demolition | $90 | |
Fence >6 feet in height | $25 | |
Residential mechanical | see HVAC fee schedule | |
Multi-family | contact electrical inspector for permit and fees | |
Electrical permits | ||
Misc. | As determined | |
Special provisions | Fee | Notes |
Replacement permits | ||
Permit only | $90 | |
Plan revisions (after two submittals) | $100 | |
Reinspections (after 1) | $100 | |
Special inspections | $100 | |
Construction without a permit | Fee X2 | |
Special inspections | $100 | |
Commercial Building Permit Fees
| ||||
Construction type | Fee | Plus | ||
1-5K sf | 5-30K sf | 30K+ sf |
Commercial Building Permit Fees
| ||||
Construction type | Fee | Plus | ||
1-5K sf | 5-30K sf | 30K+ sf | ||
New/addition to structure | $1,000 | .12/sf | .072/sf | .048/sf |
Tenant finish/alteration | $250 | .12/sf | .072/sf | .048/sf |
Change of use | ||||
If same type | $100 | |||
If different | $240 | |||
Cellular antenna tower | $180 | |||
Co-location | $120 | |||
Demolition | $120 | |||
Commercial Electric | $25 | |||
Fire alarm | $240 | |||
Fire suppression | $240 | |||
HVAC | See HVAC schedule below | |||
Range Hood | $240 | |||
Swimming pool | $240 | |||
Fence >6 feet in height | $180 | |||
Sign | $60 | |||
Retaining wall | $180 | |||
Foundation only | $180 | |||
Accessory structures/uses | $180 | |||
Special Provisions | Fee | Due |
Special Provisions | Fee | Due |
Replacement permits | ||
Permit only | $25 | |
Additional modifications | $50 | |
Reinspections (after 1) | $200 | |
Construction without a permit | Above fee x2 | |
Plan revision (after two submittals) | $100 | |
State reviewed permits | 50% of fees | |
Special inspections | $120 | |
HVAC Permit Fees
|
HVAC Permit Fees
| |
Set by Kentucky Department of Housing, Buildings and Construction (are subject to change) | |
Residential | Fee |
1 and 2 Family Dwellings (first system) | $105 |
1 and 2 Family Dwellings (each additional system) | $50 |
Multi-Family Buildings (first system) | $105 |
Multi-Family Buildings (each additional system) | $50 |
Commercial | Fee |
Amount based on total dollar value of the HVAC installation | |
2,000 or less | $125 |
2,001 to 10,000 | $180 |
10,001 to 25,000 | $270 |
25,001 to 50,000 | $330 |
50,001 to 75,000 | $390 |
75,001 to 100,000 | $500 |
100,001 to 150,000 | $630 |
150,001 to 200,000 | $760 |
200,001 to 250,000 | $885 |
250,001 to 300,000 | $1,025 |
300,001 to 400,000 | $1,150 |
400,001 to 500,000 | $1,500 |
500,001 to 600,000 | $1,725 |
600,001 to 700,000 | $1,900 |
700,001 to 800,000 | $2,125 |
800,001 to 900,000 | $2,355 |
900,001 to 1,000,000 | $2,590 |
1,000,001 to 1,100,000 | $2,820 |
1,100,001 to 1,200,000 | $3,050 |
1,200,001 to 1,300,000 | $3,280 |
1,300,001 to 1,400,000 | $3,510 |
1,400,001 to 1,500,000 | $3,735 |
1,500,001 to 1,600,000 | $3,965 |
1,600,001 and above $3,965 plus $200 per $100,000 in excess of $1,600,000 | |
The City of Independence reserves the right to request documented proof of contracted amounts. * All fees are non-refundable. * All fees to be paid in full at time of submission. | |
(A) All of the fees established herein shall be made payable to the city. The fee must accompany the application and all payments are non-refundable.
(B) All zoning and building permit fees shall be doubled for projects started without permits.
(Ord. 2015-O-08, passed 5-4-15; Am. Ord. 2023-O-07, passed 5-1-23)