§ 150.05 SCHEDULE OF FEES.
   There is hereby established the following schedule of fees for zoning permits, appeals, zoning applications, and other matters pertaining to the city zoning regulations:
Residential Building Permit Fees
Construction Type
Fee
Notes
Residential Building Permit Fees
Construction Type
Fee
Notes
Single Family Dwelling (Detached)
$0.22 per square foot
a separate HVAC permit is required for all installations
Two Family Dwelling
$0.22 per square foot
a separate HVAC permit is required for all installations
Condominium/Townhome
$0.22 per square foot
a separate HVAC permit is required for all installations
Alteration/remodel
$0.22 per square foot
a separate HVAC permit is required for all installations
Modular Home
$240
a separate HVAC permit is required for all installations
Manufactured Home
$120
a separate HVAC permit is required for all installations
Move and Set
$240
a separate HVAC permit is required for all installations
Large addition
$240
a separate HVAC permit is required for all installations
Small addition
$150
a separate HVAC permit is required for all installations
Sun Room
$90
 
Large Accessory Storage Structure
$150
 
Small Accessory Storage Structure
$90
 
Accessory Structures/Uses
$90
(decks, porches, walls +)
Basement finish/remodel
$120
 
In ground pool
$90
 
Demolition
$90
 
Fence >6 feet in height
$25
 
Residential mechanical
 
see HVAC fee schedule
   Multi-family
 
contact electrical inspector for permit and fees
Electrical permits
 
 
Misc.
As determined
 
Special provisions
Fee
Notes
Replacement permits
 
 
   Permit only
$90
 
Plan revisions (after two submittals)
$100
 
Reinspections (after 1)
$100
 
Special inspections
$100
 
Construction without a permit
Fee X2
 
Special inspections
$100
 
Commercial Building Permit Fees
Construction type
Fee
Plus
1-5K sf
5-30K sf
30K+ sf
Commercial Building Permit Fees
Construction type
Fee
Plus
1-5K sf
5-30K sf
30K+ sf
New/addition to structure
$1,000
.12/sf
.072/sf
.048/sf
Tenant finish/alteration
$250
.12/sf
.072/sf
.048/sf
Change of use
 
 
 
 
   If same type
$100
 
 
 
   If different
$240
 
 
 
Cellular antenna tower
$180
 
 
 
Co-location
$120
 
 
 
Demolition
$120
 
 
 
Commercial Electric
$25
 
 
 
Fire alarm
$240
 
 
 
Fire suppression
$240
 
 
 
HVAC
See HVAC schedule below
Range Hood
$240
 
 
 
Swimming pool
$240
 
 
 
Fence >6 feet in height
$180
 
 
 
Sign
$60
 
 
 
Retaining wall
$180
 
 
 
Foundation only
$180
 
 
 
Accessory structures/uses
$180
 
 
 
 
Special Provisions
Fee
Due
Special Provisions
Fee
Due
Replacement permits
 
 
   Permit only
$25
 
   Additional modifications
$50
 
Reinspections (after 1)
$200
 
Construction without a permit
Above fee x2
 
Plan revision (after two submittals)
$100
 
State reviewed permits
50% of fees
 
Special inspections
$120
 
 
HVAC Permit Fees
HVAC Permit Fees
Set by Kentucky Department of Housing, Buildings and Construction (are subject to change)
Residential
Fee
1 and 2 Family Dwellings (first system)
$105
1 and 2 Family Dwellings (each additional system)
$50
Multi-Family Buildings (first system)
$105
Multi-Family Buildings (each additional system)
$50
Commercial
Fee
Amount based on total dollar value of the HVAC installation
2,000 or less
$125
2,001 to 10,000
$180
10,001 to 25,000
$270
25,001 to 50,000
$330
50,001 to 75,000
$390
75,001 to 100,000
$500
100,001 to 150,000
$630
150,001 to 200,000
$760
200,001 to 250,000
$885
250,001 to 300,000
$1,025
300,001 to 400,000
$1,150
400,001 to 500,000
$1,500
500,001 to 600,000
$1,725
600,001 to 700,000
$1,900
700,001 to 800,000
$2,125
800,001 to 900,000
$2,355
900,001 to 1,000,000
$2,590
1,000,001 to 1,100,000
$2,820
1,100,001 to 1,200,000
$3,050
1,200,001 to 1,300,000
$3,280
1,300,001 to 1,400,000
$3,510
1,400,001 to 1,500,000
$3,735
1,500,001 to 1,600,000
$3,965
1,600,001 and above $3,965 plus $200 per $100,000 in excess of $1,600,000
 
The City of Independence reserves the right to request documented proof of contracted amounts.
*   All fees are non-refundable.
*   All fees to be paid in full at time of submission.
   (A)   All of the fees established herein shall be made payable to the city. The fee must accompany the application and all payments are non-refundable.
   (B)   All zoning and building permit fees shall be doubled for projects started without permits.
(Ord. 2015-O-08, passed 5-4-15; Am. Ord. 2023-O-07, passed 5-1-23)