1307.05 ELECTRICAL FEE SCHEDULE.
   (a)    New Wiring and Fixtures.
 
New single-dwelling wiring
$30.00
New single dwelling fixtures
10.00
New two-family dwelling wiring
60.00
New two-family fixtures
20.00
      A fee shall be charged for each permit issued for any electrical installation or alteration to any existing single or two-family dwelling or any existing or new industrial or commercial building or structure, as well as for new buildings, industrial or commercial, according to the following schedule:
 
(1)    Lights, switches and convenience outlets, when the number does not exceed five:
 
Base fee.
$10.00
(2)    When the number exceeds five, base fee,
 
plus per outlet
.40
(3)    Multi-outlet convenience outlets:
 
For each six feet or fraction thereof of length
.40
 
   (b)    Fixtures and Drop Cords.
 
(1)    Fee per fixture
.40
       (2)    Where fixtures contain fluorescent or similar
         electrical discharge tubes:
          A.    If more than four tubes to a fixture, each
            group of four tubes shall be deemed to be
            a separate fixture.
          B.    Where tubes exceed four feet in length, each
            four feet or fraction thereof shall be deemed
            to be a separate fixture.
      (3)    Each four feet of continuous neon tubing or of other
         similar continuous tubing shall be deemed to be a
         separate fixture.
      (4)    Electrical signs, marquees, theater footlights, border strip
          lighting, decorative lights, etc.:
         Where outlets are installed twenty-four inches or less on
          centers
 
Base fee
6.00
Plus for each outlet
.30
 
    (c)    Temporary Lighting Installations. For exhibitions, fairs,
      carnivals, etc., whether indoors or outdoors:
 
For the first 100 outlets or fraction thereof
10.00
For each outlet in excess of 100
.20
 
   (d)    High Intensity Lighting Outlets. 
(1)    For each motion picture projector using arc lamps or lamps with a wattage in excess of 1,000
6.00
(2)    Any lighting outlet, 1,000 watts or more per lamp and mercury lamps:
 
Base fee
10.00
Plus for each lamp used
2.00
(e)    All 220 Volt Outlets.
 
For each outlet
6.00
(f)    Power Bus Duct. 
 
Per foot or fraction thereof of length
.20
(g)    Heating Outlets (per outlet).
 
Up to 10 kw capacity
$6.00
Over 10 kw and up to 15 kw capacity
8.00
Over 15 kw and up to 20 kw capacity
10.00
All over 20 kw capacity
14.00
(h)    Power Outlets.
 
Fractional HP to and including:
 
1
6.00
3
8.00
6
10.00
10
12.00
15
14.00
Over 15
16.00
For each additional motor up to 6
3.00
For each additional motor over 6
4.00
(i)    Fans (in HP). 
 
1/4
2.00
½ - 3
4.00
4 - 10
8.00
Over 10
10.00
(j)    Motors (in HP).
 
1/4 - 1
2.00
1 - 3
4.00
3 - 5
6.00
5 - 10
10.00
Over 10
15.00
(k)    X-Ray Machines, Diathermy Equipment, Etc. and Similar Equipment.
 
Each unit
10.00
(Ord. 1989-50. Passed 1-2-90.)