§ 159.10 MAINTENANCE OF EROSION CONTROL MEASURES.
   During the period of land disturbance at a site, all sediment basins and other erosion control measures necessary to meet the requirements of this chapter shall be provided by the applicant and subsequent landowner. If sedimentation is likely to be a problem after land-disturbing activities have ceased, some or all of the erosion control measures shall be maintained by the applicant or subsequent landowner for as long as the problem would be likely without such measures.
(Ord. 21-C-04, passed 11-9-04)