All post construction stormwater runoff control measures including, but not limited to, those required to comply with this chapter shall meet the design criteria, standards, and specifications for post construction stormwater runoff control measures similar to or the same as those outlined in the then current “City of Huntington – Stormwater Development Manual”, “Field Office Technical Guide of the USDA Natural Resources Conservation Services” and the “Indiana Stormwater Quality Manual,” published by IDNR.
(Ord. 19-C-05, passed 11-29-05)