The demolition of every structure shall be performed in accordance with each of the following requirements:
(A) The permit shall be displayed on the site in a manner which is clearly visible to the public at all times until the demolition has been completed;
(B) A fence shall be erected around the demolition area, especially surrounding open basements or other potentially dangerous areas, to secure the site throughout the demolition process and ensure public safety. If feasible, the entire demolition site shall have a fence erected around it at all times.
(C) Compliance with any erosion control regulations set forth by the City Engineering Department, if applicable;
(D) The Demolition site shall be maintained free from all unsafe or hazardous conditions, including but not limited to, restoration of established grades, the erection of necessary retaining walls, and adequate removal of dust and debris;
(E) The demolition of a structure shall be completed within 30 days from the date the permit is issued, including the removal of the foundation and restoration to grade, unless the Department grants a permit extension; and
(F) Upon demolition of a structure, applicant shall provide the Department with backfill and compaction information, including but not limited to, compaction specifications for any soil alterations.
(Ord. 7-C-09, passed 4-28-09)