(A) Written inspection reports shall be made of the periodic inspections necessary during construction of surface and storm water management systems to ensure compliance with the approved plans.
(B) Written inspection reports shall include:
(1) The date and location of the inspection;
(2) Whether construction was in compliance with the approved surface and storm water management plan;
(3) Any variations from the approved construction specifications; and
(4) Any violations that exist.
(C) The owner/developer/applicant and on-site personnel shall be notified in writing when violations are observed. Written notification shall describe the nature of the violation and the required corrective action.
(D) No work shall proceed until the utility inspects and approves the work previously completed and furnishes the owner/developer/applicant with the results of the inspection reports as soon as possible after completion of each required inspection.
(Ord. 32-2005, passed 12-6-2005)