§ 151.10 DEFINITIONS.
   For the purpose of this chapter, the following definitions shall apply unless the context clearly indicates or requires a different meaning.
   A ZONE. Portions of the special flood hazard area (SFHA) in which the principle source of flooding is runoff from rainfall, snowmelt, or a combination of both. In A zones, floodwaters may move slowly or rapidly, but waves are usually not a significant threat to structures. Areas of 100-year flood, base flood elevations, and flood hazard factors are not determined.
   A1-30 and AE ZONES. Special flood hazard areas inundated by the 1% annual chance flood (100-year flood.) Base flood elevations (BFEs) are determined.
   A99 ZONE. That part of the SFHA inundated by the 100-year flood which is to be protected from the 100-year flood by a federal flood protection system under construction. No base flood elevations are determined.
   ACCESSORY STRUCTURE (APPURTENANT STRUCTURE). A structure located on the same parcel of property as the principle structure, the use of which is incidental to the use of the principle structure. ACCESSORY STRUCTURES should constitute a minimal initial investment, may not be used for human habitation, and should be designed to have minimal flood damage potential. Examples of ACCESSORY STRUCTURES are detached garages, carports, storage sheds, pole barns, and hay sheds.
   ACCESSORY USE. A use which is incidental and subordinate to the principal use of the parcel of land on which it is located.
   ADDITION (TO AN EXISTING STRUCTURE). Any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load-bearing wall other than a fire wall. Any walled and roofed addition which is connected by a fire wall or is separated by independent perimeter load-bearing walls is new construction.
   AH ZONE. An area of 100-year shallow flooding where depths are between one and three feet (usually shallow ponding). Base flood elevations are shown.
   AO ZONE. An area of 100-year shallow flooding where water depth is between one and three feet (usually sheet flow on sloping terrain). Flood depths are shown.
   APPEAL. - A request for a review of the city's interpretation of any provision of this chapter or a request for a variance.
   AR/A1 - A30, AR/AE, AR/AH, AR/AO, and AR/A ZONES. Special flood hazard areas (SFHAs) that result from the de-certification of a previously accredited flood protection system that is in the process of being restored to provide a 100-year or greater level of flood protection. After restoration is complete these areas will still experience residual flooding from other flooding sources.
   AREA OF SHALLOW FLOODING. A designated AO or VO Zone on a community's Flood Insurance Rate Map (FIRM) with base flood depths from one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident.
   AREA OF SPECIAL FLOOD HAZARD. The land in the flood plain within a community subject to a 1% or greater chance of flooding in any given year.
   B and X ZONES (SHADED). Areas of the 0.2% annual chance (500-year) flood, areas subject to the 100-year flood with average depths of less than one foot or with contributing drainage area less than one square mile, and areas protected by levees from the base flood.
   BASE FLOOD. The flood having a 1% chance of being equaled or exceeded in any given year.
   BASE FLOOD ELEVATION (BFE). The elevation shown on the Flood Insurance Rate Map (FIRM) for Zones AE, AH, A1-30, AR, AR/A, AR/AE, AR/A1-A30, AR/AH, and AR/AO that indicates the water surface elevation resulting from a flood that has a 1% or greater chance of being equaled or exceeded in any given year.
   BASEMENT. That portion of a building having its floor subgrade (below ground level) on all sides.
   BREAKAWAY WALL. A wall that is not part of the structural support of the building and is intended through its design and construction to collapse under specific lateral loading forces without causing damage to the elevated portion of the building or the supporting foundation system.
   BUILDING. A walled and roofed structure that is principally above ground; including a manufactured home, gas or liquid storage tank, or other man-made facility or infrastructure. See definition for STRUCTURE.
   BUILDING/ZONING PERMIT. The building/zoning permit is issued by the Flood Safety Officer when the regulations of this chapter are satisfied. Issuance of a building/zoning permit does not relieve the builder/developer from the obligations to comply with pertinent state and local ordinances.
   C and X (UNSHADED) ZONES. Areas determined to be outside the 500-year floodplain.
   COMMUNITY. A political entity having the authority to adopt and enforce floodplain ordinances for the area under its jurisdiction.
   COMMUNITY FLOOD HAZARD AREA (CFHA). An area that has been determined by the Flood Safety Officer (or other delegated, designated, or qualified community official) from available technical studies, historical information, and other available and reliable sources, which may be subject to periodic inundation by floodwaters that can adversely affect public health, safety and general welfare. Included are areas downstream from dams.
   COMMUNITY RATING SYSTEM (CRS). A program developed by the Federal Insurance Administration to provide incentives to those communities in the regular program to go beyond the minimum floodplain management requirements to develop extra measures for protection from flooding.
   CRITICAL FACILITY. Any property that, if flooded, would result in severe consequences to public health and safety or a facility which, if unusable or unreachable because of flooding, would seriously and adversely affect the health and safety of the public. Critical facilities include, but are not limited to: housing likely to contain occupants not sufficiently mobile to avoid injury or death unaided during a flood; schools, nursing homes, hospitals, police, fire and emergency response installations, vehicle and equipment storage facilities, emergency operations centers likely to be called upon before, during, and after a flood, public and private utility facilities important to maintaining or restoring normal services before, during and after a flood, and those facilities or installations which produce, use or store volatile, flammable, explosive, toxic, and/or water-reactive materials, hazardous materials, or hazardous waste.
   D ZONE. An area in which the flood hazard is undetermined.
   DEVELOPMENT. Any man-made change to improved or unimproved real estate, including, but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling operations, or permanent storage of materials.
   ELEVATED BUILDING. A non-basement building built to have the lowest floor elevated above the ground level by means of fill, solid foundation perimeter walls, pilings, columns (posts and piers), shear walls, or breakaway walls.
   ELEVATION CERTIFICATE. A statement certified by a registered professional engineer or surveyor on the FEMA-approved form in effect at the time of certification that verifies a structure's elevation and other related information to verify compliance with this chapter.
   EMERGENCY PROGRAM. The initial phase under which a community participates in the NFIP, intended to provide a first layer amount of insurance at subsidized rates on all insurable structures in that community before the effective date of the initial FIRM.
   ENCLOSURE. That portion of a structure below the Base Flood Elevation (BFE) used solely for parking of vehicles, limited storage, or access to the structure.
   ENCROACHMENT. The physical advance or infringement of uses, plant growth, fill, excavation, structures, permanent structures or development into a floodplain, which may impede or alter the flow capacity of a floodplain.
   EXISTING CONSTRUCTION. Any structure for which the start of construction commenced before the effective date of the FIRM or before January 1, 1975, for FIRMs effective before that date. EXISTING CONSTRUCTION may also be referred to as EXISTING STRUCTURES.
   EXISTING MANUFACTURED HOME PARK or SUBDIVISIONS. A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the first floodplain management ordinance adopted by the city based on specific technical base flood elevation data which established the area of special flood hazards.
   EXPANSION TO AN EXISTING MANUFACTURED HOME PARK or SUBDIVISION. The preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).
   FILL MATERIAL. Any foreign matter or material introduced into the area of special flood hazard or floodway, which changes the existing elevations and/or contours for that particular section of the river. FILL MATERIAL is normally considered rock, construction debris, earth, asphalt, or any material which, in the opinion of the Flood Safety Officer, is a change to the area of special flood hazard or floodway. It is the intent of this definition to cover any foreign matter or material that is introduced into the area of special flood hazard or floodway that did not exist on the site prior to the adoption of this chapter.
   FIVE-HUNDRED YEAR FLOOD. The flood that has a 0.2% chance of being equaled or exceeded in any year. Areas subject to the 500-YEAR FLOOD have a moderate to low risk of flooding.
   FLOOD, FLOODING, or FLOOD WATER. 
      (1)   A general and temporary condition of partial or complete inundation of normally dry land areas from the overflow of inland or tidal waters; the unusual and rapid accumulation or runoff of surface waters from any source; and/or mudslides (i.e. mudflows). See MUDSLIDES.
      (2)   The condition resulting from flood-related erosion. See FLOOD-RELATED EROSION.
   FLOOD BOUNDARY and FLOODWAY MAP (FBFM). A map on which the Federal Emergency Management Agency (FEMA) or Federal Insurance Administration (FIA) has delineated the areas of flood hazards and the regulatory floodway.
   FLOOD HAZARD BOUNDARY MAP (FHBM). A map on which the boundaries of the flood, mudslide (i.e. mudflow), and flood-related erosion areas having special hazards have been designated as Zones A, M, and/or E by the Federal Emergency Management Agency (FEMA) or Federal Insurance Administration (FIA).
   FLOOD INSURANCE RATE MAP (FIRM). An official map of a community, on which the Federal Emergency Management Agency has delineated both the areas of special flood hazard and the risk premium zones applicable to the community.
   FLOOD INSURANCE STUDY. The official report provided by the Federal Emergency Management Agency. The report contains flood profiles, as well as the Flood Boundary-Floodway Map and the water surface elevation of the base flood.
   FLOOD SAFETY OFFICER. The individual appointed by a NFIP participating community to administer and enforce the floodplain management ordinances. The FLOOD SAFETY OFFICER for Hopkinsville is the Director of the Hopkinsville-Christian County Planning Commission.
   FLOODPLAIN or FLOOD-PRONE AREA. Any land area susceptible to being inundated by flood waters from any source.
   FLOODPLAIN MANAGEMENT. The operation of an overall program of corrective and preventive measures for reducing flood damage and preserving and enhancing natural resources in the floodplain, including but not limited to emergency preparedness plans, flood control works, floodplain management ordinances, and open space plans.
   FLOODPLAIN MANAGEMENT REGULATIONS. This chapter and other zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances (such as grading and erosion control), and other applications of police power, which control development in flood-prone areas. This term describes federal, state and/or local regulations, in any combination thereof, which provide standards for the purpose of flood damage prevention and reduction.
   FLOODPROOFING. Any combination of structural and non-structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitation facilities, structures, and their contents.
   FLOODPROOFING CERTIFICATE. A certification by a registered professional engineer or architect, on a FEMA-approved form in effect at the time of certification stating that a non-residential structure, together with attendant utilities and sanitary facilities is watertight to a specified design elevation with walls that are substantially impermeable to the passage of water and all structural components are capable of resisting hydrostatic and hydrodynamic flood forces, including the effects of buoyancy and anticipated debris impact forces.
   FLOODWAY. The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot.
   FLOODWAY FRINGE. That area of the floodplain on either side of the regulatory floodway where encroachment may be permitted without additional hydraulic and/or hydrologic analysis.
   FLOOR. The top surface of an enclosed area in a building (including the basement); i.e., the top of the slab in concrete slab construction or the top of wood flooring in wood frame construction. The term does not include the floor of a garage used solely for parking vehicles.
   FRAUD AND VICTIMIZATION. As related in § 151.51, means that the variance granted must not cause fraud on or victimization of the public. In examining this requirement, the City of Hopkinsville will consider the fact that every newly constructed structure adds to government responsibilities and remains a part of the community for 50 to 100 years. Structures that are permitted to be constructed below the base flood elevation are subject during all those years to increased risk of damage from floods, while future owners of the property and the community as a whole are subject to all the costs, inconvenience, danger, and suffering that those increased flood damages may incur. In addition, future owners may purchase the property, unaware that it is subject to potential flood damage, and can be insured only at very high flood insurance rates.
   FREEBOARD. A factor of safety, usually expressed in feet above the BFE, which is applied for the purposes of floodplain management. It is used to compensate for the many unknown factors that could contribute to flood heights greater than those calculated for the base flood. FREEBOARD must be applied not just to the elevation of the lowest floor or floodproofing level, but also to the level of protection provided to all components of the structure, such as building utilities, HVAC components, etc.
   FUNCTIONALLY DEPENDENT USE FACILITY. A facility which cannot be used for its intended purpose unless it is located or carried out in close proximity to water, such as a docking or port facility necessary for the loading and unloading of cargo or passengers, shipbuilding, ship repair, or seafood processing facilities. The term does not include long-term storage, manufacture, sales, or service facilities.
   GOVERNING BODY. The local governing unit, i.e. county or municipality that is empowered to adopt and implement ordinances to provide for the public health, safety and general welfare of its citizenry.
   HAZARD POTENTIAL. The possible adverse incremental consequences that result from the release of water or stored contents due to failure of a dam or misoperation of a dam or appurtenances. The HAZARD POTENTIAL classification of a dam does not reflect in any way the current condition of a dam and its appurtenant structures (e.g., safety, structural integrity, flood routing capacity).
   HEC II. The Army Corps of Engineers' step back water computer program and/or an approved computer modeling program.
   HIGHEST ADJACENT GRADE. The highest natural elevation of the ground surface, prior to construction, next to the proposed walls of a structure.
   HISTORIC STRUCTURE. Any structure that is:
      (1)   Listed individually in the National Register of Historic Places (a listing maintained by the Department of the Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
      (2)   Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;
      (3)   Individually listed on state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or
      (4)   Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either:
         (a)   By an approved state program as determined by the Secretary of the Interior; or
         (b)   Directly by the Secretary of the Interior in states without approved programs.
   INCREASED COST OF COMPLIANCE (ICC).
      (1)   INCREASED COST OF COMPLIANCE coverage provides for the payment of a claim for the cost to comply with state or community floodplain management laws or ordinances after a direct physical loss by flood. When a building covered by a Standard Flood Insurance Policy under the NFIP sustains a loss and the state or community declares the building to be substantially or repetitively damaged, ICC will help pay up to $30,000 for the cost to elevate, floodproof, demolish, or remove the building.
      (2)   ICC coverage is available on residential and non-residential buildings (this category includes public or government buildings, such as schools, libraries, and municipal buildings) insured under the NFIP.
   KENTUCKY REVISED STATUTE 151.250. Plans for dams, levees, etc. to be approved and permit issued by cabinet (Environmental and Public Protection Cabinet):
      (1)   Notwithstanding any other provision of law, no person and no city, county or other political subdivision of the state, including levee districts, drainage districts, flood control districts or systems, or similar bodies, shall commence the construction, reconstruction, relocation or improvement of any dam, embankment, levee, dike, bridge, fill or other obstruction (except those constructed by the Department of Highways) across or along any stream, or in the floodway of any stream, unless the plans and specifications for such work have been submitted by the person or political subdivision responsible for the construction, reconstruction or improvement and such plans and specifications have been approved in writing by the cabinet and a permit issued. However, the cabinet by regulation may exempt those dams, embankments or other obstructions which are not of such size or type as to require approval by the cabinet in the interest of safety or retention of water supply.
      (2)   No person, city, county, or other political subdivision of the state shall commence the filing of any area with earth, debris, or any other material, or raise the level of any area in any manner, or place a building, barrier or obstruction of any sort on any area located adjacent to a river or stream or in the floodway of the stream so that such filling, raising, or obstruction will in any way affect the flow of water in the channel or in the floodway of the stream unless plans and specifications for such work have been submitted to and approved by the cabinet and a permit issued as required in subsection (1) above.
      (3)   Nothing in this section is intended to give the cabinet any jurisdiction or control over the construction, reconstruction, improvement, enlargement, maintenance or operation of any drainage district, ditch or system established for agricultural purposes, or to require approval of the same except where such obstruction of the stream or floodway is determined by the cabinet to be a detriment or hindrance to the beneficial use of water resources in the area, and the person or political subdivision in control thereof so notified. The Department for Natural Resources through KRS Chapter 350 shall have exclusive jurisdiction over KRS Chapter 151 concerning the regulation of dams, levees, embankments, dikes, bridges, fills, or other obstructions across or along any stream or in the floodway of any stream which structures are permitted under KRS Chapter 350 for surface coal mining operations.
   LETTER OF MAP CHANGE (LOMC). An official FEMA determination, by letter, to amend or revise effective Flood Insurance Rate Maps, Flood Boundary and Floodway Maps, and Flood Insurance Studies. LOMC's include the following categories:
      (1)   LETTER OF MAP AMENDMENT (LOMA). A revision based on technical data showing that a property was incorrectly included in a designated SFHA. A LOMA amends the current effective FIRM and establishes that a specific property is not located in a SFHA.
      (2)   LETTER OF MAP REVISION (LOMR). A revision based on technical data that, usually due to manmade changes, shows changes to flood zones, flood elevations, floodplain and floodway delineations, and planimetric features.
      (3)   LETTER OF MAP REVISION - FILL (LOMR-F). A determination that a structure or parcel has been elevated by properly placed engineered fill above the BFE and is, therefore, excluded from the SHFA.
   LEVEE. A man-made structure, usually an earthen embankment, designed and constructed in accordance with sound engineering practices to contain, control, or divert the flow of water so as to provide protection from temporary flooding.
   LEVEE SYSTEM.  
      (1)   A flood protection system that consists of a levee, or levees, and associated structures, such as closure and drainage devices, which are constructed and operated in accordance with sound engineering practices.
      (2)   For a levee system to be recognized, the following criteria must be met:
         (a)   All closure devices or mechanical systems for internal drainage, whether manual or automatic, must be operated in accordance with an officially adopted operation manual (a copy of which must be provided to FEMA by the operator when levee or drainage system recognition is being sought or revised).
         (b)   All operations must be under the jurisdiction of a federal or state agency, an agency created by federal or state law, or an agency of a community participating in the NFIP.
   LIMITED STORAGE. An area used for storage and intended to be limited to incidental items which can withstand exposure to the elements and have low flood damage potential. Such an area must be of flood resistant material, void of utilities except for essential lighting, and cannot be temperature controlled.
   LOWEST ADJACENT GRADE. The elevation of the sidewalk, patio, deck support, or basement entryway immediately next to the structure and after the completion of construction. It does not include earth that is emplaced for aesthetic or landscape reasons around a foundation wall. It does include natural ground or properly compacted fill that comprises a component of a structure's foundation system.
   LOWEST FLOOR. The lowest floor of the lowest enclosed area including basement. An unfinished or flood resistant enclosure, usable solely for parking of vehicles, structure access, or storage in an area other than a basement area is not considered a structure's lowest floor, provided that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements of this chapter.
   MANUFACTURED HOME. A structure, transportable in one or more sections, which is built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term also includes part trailers and similar transportable structures, placed on a site for 180 consecutive days or longer and intended to be improved property.
   MANUFACTURED HOME PARK or SUBDIVISION. A parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
   MAP. The Flood Hazard Boundary Map (FHBM) or the Flood Insurance Rate Map (FIRM) for a community issued by the Federal Emergency Management Agency (FEMA).
   MAP PANEL NUMBER. The four-digit number on a flood map, followed by a letter suffix, assigned by FEMA. The first four digits represent the map panel. The letter suffix represents the number of times the map panel has been revised. (The letter “A” is not used by FEMA, the letter “B” is the first revision.)
   MARKET VALUE. The structure value, excluding the land (as agreed between a willing buyer and seller), as established by what the local real estate market will bear. MARKET VALUE can be established by independent certified appraisal; replacement cost depreciated by age of structure (actual cash value) or adjusted assessed values.
   MEAN SEA LEVEL. The average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the flood plain. For purposes of this chapter, the term is synonymous with either the National Geodetic Vertical Datum (NGVD) 1929 or North American Vertical Datum (NAVD) 1988.
   MITIGATION. Sustained actions taken to reduce or eliminate long-term risk to people and property from hazards and their effects. The purpose of mitigation is twofold: to protect people and structures, and to minimize the costs of disaster response and recovery.
   MUDSLIDE (i.e. MUDFLOW). Describes a condition where there is a river, flow, or inundation of liquid mud down a hillside, usually as a result of a dual condition of loss of brush cover and the subsequent accumulation of water on the ground, preceded by a period of unusually heavy or sustained rain. A MUDSLIDE (i.e. MUDFLOW) may occur as a distinct phenomenon while a landslide is in progress, and will be recognized as such by the Flood Safety Officer only if the MUDFLOW, and not the landslide, is the proximate cause of damage that occurs.
   MUDSLIDE (i.e. MUDFLOW) AREA MANAGEMENT. The operation of and overall program of corrective and preventative measures for reducing MUDSLIDE (i.e. MUDFLOW) damage, including but not limited to emergency preparedness plans, mudslide control works, and floodplain management regulations.
   MUDSLIDE (i.e. MUDFLOW) PRONE AREA. An area with land surfaces and slopes of unconsolidated material where the history, geology, and climate indicate a potential for MUDFLOW.
   NATIONAL FLOOD INSURANCE PROGRAM (NFIP). The federal program that makes flood insurance available to owners of property in participating communities nationwide through the cooperative efforts of the federal government and the private insurance industry.
   NATIONAL GEODETIC VERTICAL DATUM (NGVD). As corrected in 1929, is a vertical control used as a reference for establishing varying elevations within the flood plain.
   NEW CONSTRUCTION. Structures for which the start of construction commenced on or after the effective date of this chapter and includes any subsequent improvements to such structures.
   NEW MANUFACTURED HOME PARK or SUBDIVISION. A MANUFACTURED HOME PARK or SUBDIVISION for which construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of this chapter.
   NON-RESIDENTIAL. Structures that are not designed for human habitation, including but is not limited to: small business concerns, churches, schools, farm structures (including grain bins and silos), pool houses, clubhouses, recreational structures, mercantile structures, agricultural and industrial structures, warehouses, and hotels or motels with normal room rentals for less than six-months’ duration.
   NORTH AMERICAN VERTICAL DATUM (NAVD). As corrected in 1988, a vertical control used as a reference for establishing varying elevations within the floodplain. (Generally used on the newer FIRM's and Digitally Referenced FIRM's (DFIRM's)). (Refer to FIRM or DFIRM legend panel for correct datum.)
   OBSTRUCTION. Includes but is not limited to any dam, wall, embankment, levee, dike, pile, abutment, protection, excavation, channelization, bridge, conduit, culvert, structure, wire, fence, rock, gravel, refuse, fill, structure, vegetation or other material in, along, across or projecting into any watercourse which may alter, impede, retard, or change the direction and/or velocity of the flow of water, due to its location, its propensity to snare or collect debris carried by the flow of water, or its likelihood of being carried downstream.
   ONE-HUNDRED YEAR FLOOD (100-YEAR FLOOD) (see BASE FLOOD). The flood that has a 1% or greater chance of being equaled or exceeded in any given year. Any flood zone that begins with the letter A is subject to the 100-YEAR FLOOD. Over the life of a 30-year loan, there is a 26% chance of experiencing such a flood with the SFHA.
   PARTICIPATING COMMUNITY. A community that voluntarily elects to participate in the NFIP by adopting and enforcing floodplain management regulations that are consistent with the standards of the NFIP.
   POST-FIRM CONSTRUCTION. Construction or substantial improvement that started on or after the effective date of the initial FIRM of the community or after December 31, 1974, whichever is later.
   PRE-FIRM CONSTRUCTION. Construction or substantial improvement, which started on or before December 31, 1974, or before the effective date of the initial FIRM of the community, whichever is later.
   PROBATION. A means of formally notifying participating NFIP communities of violations and deficiencies in the administration and enforcement of the local floodplain management regulations. During periods of probation, each insurance policy is subject to a $50 surcharge.
   PROGRAM DEFICIENCY. A defect in a community's floodplain management regulations or administrative procedures that impairs effective implementation of those floodplain management standards or of the standards of 44 C.F.R. pts. 60.3, 60.4, 60.5, and/or 60.6.
   PUBLIC SAFETY and NUISANCE. Anything which is injurious to safety or health of an entire community or neighborhood, or any considerable number of persons, or unlawfully obstructs the free passage or use, in the customary manner, of any navigable lake, or river, bay, stream, canal, or basin.
   RECREATIONAL VEHICLE. A vehicle that is:
      (1)   Built on a single chassis;
      (2)   Four hundred square feet or less when measured at the largest horizontal projection;
      (3)   Designed to be self-propelled or permanently towable to a light duty truck; and
      (4)   Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.
   REGULAR PROGRAM. The phase of a community's participation in the NFIP where more comprehensive floodplain management requirements are imposed and higher amounts of insurance are available based upon risk zones and elevations determined in a FIS.
   REGULATORY FLOODWAY. The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. See BASE FLOOD.
   REMEDY A VIOLATION. The process by which a community brings a structure or other development into compliance with state or local floodplain management regulations, or, if this is not possible, to reduce the impact of non-compliance. Reduced impact may include protecting the structure or other affected development from flood damages, implementing the enforcement provisions of the ordinance or otherwise deterring future similar violations, or reducing state or federal financing exposure with regard to the structure or other development.
   REPAIR - The reconstruction or renewal of any part of an existing structure.
   REPETITIVE LOSS. Flood-related damages sustained by a structure on two or more separate occasions during a ten-year period where the value of damages equals or exceeds an average of 50% of the current value of the structure, beginning on the date when the damage first occurred, or, four or more flood losses of $1,000 or more over the life of the structure, or, three or more flood losses over the life of the structure that are equal to or greater than the current value of the structure.
   RIVERINE. Relating to, formed by, or resembling a river (including tributaries), stream, brook, etc.
   SECTION 1316. That section of the National Flood Insurance Act of 1968, as amended, which states that no new or renewal flood insurance coverage shall be provided for any property that the Administrator finds has been declared by a duly constituted state or local zoning authority or other authorized public body to be in violation of state or local laws, regulations, or ordinances that are intended to discourage or otherwise restrict land development or occupancy in flood-prone areas.
   SHEET FLOW AREA. See AREA OF SHALLOW FLOODING.
   SIGNIFICANT. The term as defined by this chapter shall not be construed as exceeding more than six inches in the increase of flood water elevations. The six-inch measurement is based on the accuracy of the HEC II analysis used by the Army Corps of Engineers in defining the floodway hazard. The HEC II computer run is accurate to six inches.
   SPECIAL FLOOD HAZARD AREA (SFHA). That portion of the floodplain subject to inundation by the base flood and/or flood-related erosion hazards as shown on a FHBM or FIRM as Zone A, AE, A1 - A30, AH, AO, or AR.
   START OF CONSTRUCTION. The first placement of permanent construction of a structure (including a manufactured home) on a site, such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation or the placement of a manufactured home on a foundation. Permanent construction does include land preparation, such as clearing, grading, and filling; it includes the installation of streets and/or walkways; it includes excavation for a basement, footings, piers, or foundations, or the erection of temporary forms; it includes the installation on the property of accessory buildings.
   STRUCTURE. A walled and roofed building that is principally above ground, manufactured home, a gas or liquid storage tank, or other man-made facilities or infrastructures.
   SUBDIVISION. Any division, for the purposes of sale, lease, or development, either on the installment plan or upon any and all other plans, terms and conditions, of any tract or parcel of land into two or more lots or parcels.
   SUBROGATION. An action brought by FEMA to recover insurance money paid out where all or part of the damage can be attributed to acts or omissions by a community or other third party.
   SUBSTANTIAL DAMAGE.
      (1)   Means any damage to a building for which the cost of repairs equals or exceeds 50% of the market value of the building prior to the damage occurring. This term includes structures that are categorized as repetitive loss.
      (2)   For the purposes of this definition, REPAIR is considered to occur when the first repair or reconstruction of any wall, ceiling, floor, or other structural part of the building commences. The term does not apply to:
         (a)   Any project for improvement of a building required to comply with existing health, sanitary, or safety code specifications which have been identified by the Code Enforcement Official and which are solely necessary to assure safe living conditions; or
         (b)   Any alteration of an historic structure provided that the alteration will not preclude the structure's continued designation as an historic structure.
   SUBSTANTIAL IMPROVEMENT. Means any combination of reconstruction, alteration, or improvement to a building, taking place during a one-year period, in which the cumulative percentage of improvement equals or exceeds 50% of the current market value of the building. For the purposes of this definition, an IMPROVEMENT occurs when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the building. The term does not apply to:
      (1)   Any project for improvement of a building required to comply with existing health, sanitary, or safety code specifications which have been identified by the Code Enforcement Official and which are solely necessary to assure safe living conditions;
      (2)   Any alteration of an historic structure provided that the alteration will not preclude the structure's continued designation as an historic structure; or
      (3)   Any building that has been damaged from any source or is categorized as repetitive loss.
   SUBSTANTIALLY IMPROVED EXISTING MANUFACTURED HOME PARK or SUBDIVISION. Where the repair, reconstruction, rehabilitation, or improvement of the streets, utilities, and pads equals or exceeds 50% of the value of the streets, utilities, and pads before the repair, reconstruction, or improvements commenced.
   SUSPENSION. Removal of a participating community from the NFIP for failure to enact and/or enforce floodplain management regulations required for participation in the NFIP. New or renewal flood insurance policies are no longer available in suspended communities.
   UTILITIES. Includes electrical, heating, ventilation, plumbing, and air conditioning equipment.
   VARIANCE. A grant of relief from the requirements of this chapter which permits construction in a manner otherwise prohibited by this chapter where specific enforcement would result in unnecessary hardship.
   VIOLATION. Failure of a structure or other development to fully comply with this chapter. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in this chapter is presumed to be in violation until such time as that documentation is provided.
   WATER SURFACE ELEVATION. The height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, (or other datum, where specified) of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.
   WATERCOURSE. A lake, river, creek, stream, wash, channel or other topographic feature on or over which water flows at least periodically.
   WATERSHED. All the area within a geographic boundary from which water, sediments, dissolved materials, and other transportable materials drain or are carried by water to a common outlet, such as a point on a larger stream, lake, or underlying aquifer.
   X ZONE. The area where the flood hazard is less than that in the SFHA. Shaded X ZONES shown on recent FIRMs (B zones on older FIRMs) designate areas subject to inundation by the flood with a 0.2% probability of being equaled or exceeded (the 500-year flood) in any year. Unshaded X ZONES (C zones on older FIRMS) designate areas where the annual exceedance probability of flooding is less than 0.2%.
   ZONE. A geographical area shown on a Flood Hazard Boundary Map or a Flood Insurance Rate Map that reflects the severity or type of flooding in the area.
(Ord. 16-2008, passed 8-5-2008)