Loading...
Construction sites and operations shall be required to maintain during and after all construction, development, excavation and/or alteration operations, structural and non-structural best management practices with the intent to reduce pollutants and sediment in stormwater runoff.
(A) Construction and operations site plans and permits shall be required and reviewed by the city prior to the initiation of construction operations. Site plans shall include descriptions of structures, procedures, and or control measures designed to reduce and control sediment and pollutant loading either directly or indirectly to stormwater runoff.
(B) Construction or construction operations over any existing or planned stormwater management system or any such operations causing interference with any stormwater management system shall not be permitted.
(C) A schedule of inspections for monitoring shall be developed to be carried out during and after the construction and operation phases as conditions to the permit to determine and verify compliance with this section.
(Ord. O-93-52, passed 10-20-93)
Industrial sites and industrial activities determined by the city to contribute pollutant loadings to stormwater and or the storm sewer system shall be inspected and monitored by the city in order to verify compliance with this section.
(A) It shall be unlawful to deposit, spill, dump, or introduce any significant material or pollutants that may contribute contamination to any surface area, storm sewer system, and/or stormwater runoff. It shall be unlawful to deposit, spill, dump or introduce:
(1) Substances that settle to form sludge deposits.
(2) Floatable or suspended substances such as debris, oil, scum, and other materials.
(3) Any significant substance, petroleum product, infectious matter, toxic or hazardous substance or hazardous material onto surface areas or to storm water management systems.
(4) Industrial wastewater, domestic, cooling or any other wastewater into any sewer designated to carry stormwater without prior city or Broward County approval.
(B) Any site and or activity identified as contributing any significant material and or pollutants shall be required:
(1) To develop and initiate structural systems and or non-structural management practices designed to reduce and control the contribution or pollutants to stormwater, surface areas and/or to storm water management.
(2) To be inspected and monitored by the city in order to verify compliance with this section.
(Ord. O-93-52, passed 10-20-93)
Operations of any landfill or dump site shall be conducted to provide for collection, control and treatment of surface runoff and verification that no significant pollutant contribution to receiving waters shall occur upon discharge of said runoff.
(Ord. O-93-52, passed 10-20-93)
Any dumping, spilling, or discharging of any non-stormwater material to any surface area or storm water management system shall be prohibited unless allowed by prior written approval from the city. Prohibited illicit discharges shall require spill response, spill control, and spill clean up as designated and prescribed by the city.
(Ord. O-93-52, passed 10-20-93)
Loading...